Compare monthly payment vs savings, total interest, down payment and payback—not just 'zero down'.

Updated 2026-11-01About 3 minLocal test
Quick answer

Compare monthly payment vs savings, total interest, down payment and payback—not just 'zero down'. Compare quotes by $/W/equipment/warranty/production/financing, not just total.

Why it matters

Low payments can hide long terms/high interest.

Low bids may cut equipment.

Step by step

  1. Confirm system size/$ per watt/incentive eligibility.
  2. Use local production (kWh/kW/year) and your own rate—not a national average.
  3. Calculate net cost, annual savings, simple payback, then a 25-year degradation/rate model.
  4. List loan payments/lease escalators/maintenance/insurance separately.
  5. Get 3 quotes and compare $/W/equipment/warranty/production line by line.

Common mistakes

  • Valuing all production at the retail rate.
  • Counting uncertain incentives in payback.
  • Multiplying first-year production by 25 and ignoring degradation.
  • Comparing only total price, not $/W/equipment/warranty.

Checklist

  • System size/$ per watt/incentives confirmed.
  • Local production/self-use rate/net metering confirmed.
  • Net cost/payback/25-year model calculated.
  • Loan/lease/maintenance/insurance listed separately.
  • Three quotes compared line by line.

Key facts

  • Low bids may cut equipment.
  • Ask if permits/interconnection are included.

FAQ

Is financing Quotes worth it?

Compare monthly payment vs savings, total interest, down payment and payback—not just 'zero down'. Compare quotes by $/W/equipment/warranty/production/financing, not just total.

How long does it take?

Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.

Is data uploaded?

Runs locally and does not upload video/audio; extensions may still read the page.

Source: DOE