Quick answer
Check license/insurance/local projects/warranty/service, not just ratings. Off-grid needs batteries/backup and is usually much more expensive.
Why it matters
Installer bankruptcy can void warranties.
Grid-tied payback doesn't apply.
Step by step
- Confirm system size/$ per watt/incentive eligibility.
- Use local production (kWh/kW/year) and your own rate—not a national average.
- Calculate net cost, annual savings, simple payback, then a 25-year degradation/rate model.
- List loan payments/lease escalators/maintenance/insurance separately.
- Get 3 quotes and compare $/W/equipment/warranty/production line by line.
Common mistakes
- Valuing all production at the retail rate.
- Counting uncertain incentives in payback.
- Multiplying first-year production by 25 and ignoring degradation.
- Comparing only total price, not $/W/equipment/warranty.
Checklist
- System size/$ per watt/incentives confirmed.
- Local production/self-use rate/net metering confirmed.
- Net cost/payback/25-year model calculated.
- Loan/lease/maintenance/insurance listed separately.
- Three quotes compared line by line.
Key facts
- Grid-tied payback doesn't apply.
- Maintenance/replacement costs are high.
FAQ
How do I choose a Off-grid installer?
Check license/insurance/local projects/warranty/service, not just ratings. Off-grid needs batteries/backup and is usually much more expensive.
How long does it take?
Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.
Is data uploaded?
Runs locally and does not upload video/audio; extensions may still read the page.
Source: DOE