Quick answer
Mainly cleaning/inspection/inverter replacement; include insurance/monitoring/repair reserves. Compare quotes by $/W/equipment/warranty/production/financing, not just total.
Why it matters
A zero-maintenance assumption inflates 25-year net savings.
Low bids may cut equipment.
Step by step
- Confirm system size/$ per watt/incentive eligibility.
- Use local production (kWh/kW/year) and your own rate—not a national average.
- Calculate net cost, annual savings, simple payback, then a 25-year degradation/rate model.
- List loan payments/lease escalators/maintenance/insurance separately.
- Get 3 quotes and compare $/W/equipment/warranty/production line by line.
Common mistakes
- Valuing all production at the retail rate.
- Counting uncertain incentives in payback.
- Multiplying first-year production by 25 and ignoring degradation.
- Comparing only total price, not $/W/equipment/warranty.
Checklist
- System size/$ per watt/incentives confirmed.
- Local production/self-use rate/net metering confirmed.
- Net cost/payback/25-year model calculated.
- Loan/lease/maintenance/insurance listed separately.
- Three quotes compared line by line.
Key facts
- Low bids may cut equipment.
- Ask if permits/interconnection are included.
FAQ
What maintenance does Quotes need?
Mainly cleaning/inspection/inverter replacement; include insurance/monitoring/repair reserves. Compare quotes by $/W/equipment/warranty/production/financing, not just total.
How long does it take?
Usually 1-3 minutes; for intermittent issues, run 30 seconds and retest elsewhere.
Is data uploaded?
Runs locally and does not upload video/audio; extensions may still read the page.
Source: DOE